PDU vertical
PDU vertical
Main purpose
Astergo power distribution units (hereinafter referred to as PDUs) are designed to connect IT equipment to the power supply system inside the cabinets. Designed for cabinets of any manufacturers.
Design features
Vertical SLBMs are mounted without the use of tools.
  • Output connector types: C13, C19, SCHUKO.< / li>
  • Maximum power from 2.2 to 22 kW.< / li>
  • Maximum current: 10 to 32 A.< / li>
  • Voltage: 230 and 400 V.< / li> 

Astergo power distribution units provide more connection points due to the high density of connectors. In the AST.PV4000 series PDU, sockets with cable fixation are installed. Removing the cable plug is possible only after pressing the lock button.     

Technical Specifications

SKU Product Name Width, mm Depth, mm Height, mm Rated voltage, V

BASIC VERTICAL POWER DISTRIBUTION UNITS

AST.PA2001 Switchgear unit pit. AST vert., 1 phase, 16A, Schuko-12, vx. Schuko, kab. 1,8 m 44 50 720 230
AST.PA2002 Camshaft unit. pit. AST vert., 1 phase, 16A, C13-12, vx. C20, cab. 1.8 m 44 50 720 230
AST.PV2001 Switchgear unit pit. AST vert., 1 phase, 16A, C13-8, Schuko-8, 1 auth., vx. C20 56 50(90) 800 230
AST.PV2002 Switchgear unit. pit. AST vert., 1 phase, 16A, C13-12, C19-2, Schuko-2, 1 auth., bx. C20 56 50(90) 800 230
AST.PV2003 Switchgear unit AST vert., 1 phase, 32A, C13-36, C19-12, Schuko-3, 2 auth., vx.IEC 309, kab. 2,5 m 56 50(90) 1790 230
AST.PV2004 Switchgear unit AST vert., 3 phase, 16A, C13-24, C19-12, Schuko-3, 3 auth., vx.IEC 309, kab. 2,5 m 56 50(90) 1790 400
AST.PV2005 Switchgear unit AST vert., 3 phase, 32A, C13-24, C19-12, Schuko-3, 6 auth., vx.IEC 309, kab. 2,5 m 56 50(90) 1790 400
AST.PV2007 Switchgear unit AST vert., 3 phase, 32A, C13-24, C19-12, Schuko-3, 6 auth., indicator, vx. IEC 309, kab. 2,5 m 56 50(90) 1790 400
AST.PV4001 Switchgear unit AST vert., 1 phase, 16A, C13-24, C19-6, connector.c fix, 1 auth., vx. C20, kab.3m 56 45 1497 230
AST.PV4002 Switchgear unit AST vert., 1 phase, 32A, C13-24, C19-6, connector.with fix, 2 auth., vx. IEC 309, kab.3m 56 45 1658 230
AST.PV4003 Switchgear unit AST vert., 1 phase, 32A, C13-36, C19-6, 2 auth., vx. IEC 309, kab.3m 56 45 1828 230
AST.PV4004 Switchgear unit AST vert., 3 phase, 16A, C13-24 , C19-6, connector.c fix, 3 auth., vx. IEC 309, kab.3m 56 45 1827 400
AST.PV4005 Switchgear unit AST vert., 3 phase, 32A, C13-36, C19-6, 6 auth., vx. IEC 309, kab.3m 56 45 1772 400
AST.PV4006 Switchgear unit AST vert., 3 phase, 32A, C13-30, C19-12, 6 auth., vx. IEC 309, kab.3m 56 45 1832 400

 

Main purpose
Astergo power distribution units (hereinafter referred to as PDUs) are designed to connect IT equipment to the power supply system inside the cabinets. Designed for cabinets of any manufacturers.
Design features
Vertical SLBMs are mounted without the use of tools.